I was sitting in the blogger room this morning at SAP TechEd in Phoenix, and heard Marilyn Pratt mention my name over at another table: usually something that makes me perk up my ears, since Marilyn is a primo community builder, and I had the feeling that I was about to be recruited for something. 🙂 I’m already signed up as a judge/critic for the Process Design Slam event here tonight, which is the culmination (along with the TechEd events in Vienna and Bangalore) of a three-month virtual community collaboration for applying BPM tools and methodologies to solve a specific business challenge.
The selected process, from the design slam wiki:
Automating business processes related to forming virtual community-based power plant made up of resident’s personal solar wind generation.
The idea is to describe a process that allows a homeowner or business to come online as a micro generator within a township and the various steps (human and automated) that are required. Sustainability gets better over time, the more neighborhoods choose to generate power from green sources to supply the very power this neighborhood consumes – and in pretty much the same timeframe. This also reduces the losses of transporting power over longer distances. Thus, power companies will more and more become brokers, and less actual suppliers of power.
After a chat with Marilyn, we’ve decided that I’ll interview the winners (briefly, since it will be after midnight, which is 3am in my time zone) and write a short blog post about their winning contribution. This will definitely break my standard rule that everything is off the record once the bar opens.
The community has already done a lot of the work, including creating and agreeing upon a process map using NetWeaver BPM 7.1:
and rules in NetWeaver BRM 7.1:
Keep an eye on the #BPXslam09 hashtag on Twitter for up-to-date news as the day progresses.