links for 2009-03-24

  • Comments on starting with current-state process models versus future-state. I find it hard to start without at least a high-level current state model, but like Craig, I don't like to spent too much time on that until we have a least a high-level future-state model. Then, go back and drive out the requirements and exception cases from the current state.
    (tags: bpa)

Leave a Reply